ABI Telescopic Leader Masts

Bild

ABI MOBILRAM TM 11/14 SL

The ABI MOBILRAM TM 11/14 SL is suitable for piling and drilling jobs, typically applied in urban developments.

Bild

ABI MOBILRAM TM 13/16 SL

Our "bread and butter" unit - the ABI MOBILRAM TM13/16 SL well tried on countless sites and most often sold. The TM 13/16 SL can be mounted on two types of carriers, either on SR 30 or on SR 35, if more power is required.

Bild

ABI MOBILRAMs TM 14/17 V and VSL

The design of the ABI MOBILRAM TM 14/17 V is focused on low transport weight, paired with high torque absorption and maximum piling length. This telescopic leader mast in box design is suitable for piling and drilling applications.

Bild

ABI MOBILRAM TM 13

The MOBILRAM-System TM 13 is the smallest machine of the new leader mast generation. The telescopic leader mast offers high extraction forces as well as high torque absorption and very compact dimensions.

Bild

ABI MOBILRAM TM 17

The MOBILRAM-System TM 17 belongs to the new leader mast generation and can be used for piling and drilling jobs. Among the main advantages is high torsional rigidity at relative low transport weight.

Bild

ABI MOBILRAM TM 20

The MOBILRAM-System TM 20 is a telescopic leader mast of the new generation designed on H kinematics. It combines the benefits of the smaller TM 17 with more usable length.

Bild

ABI MOBILRAM TM 22

The ABI MOBILRAM-System TM 22 is a combination from years of practical site and design experience in special civil engineering machines. The rugged telescopic leader mast design has a torque absorption of 200 kNm. Both the inner and outer mast are designed as closed profiles and fit perfectly to one another. Large pre-stressing forces and high torsional rigidity are achieved using less material input. In addition the friction losses within the mast are greatly reduced.

Bild

ABI MOBILRAM TM 26

The TM 26 is the largest telescopic leader mast with an effective length of approx. 26 m. The machine is mounted on the SR 45 carrier with reinforced kinematics. It is ideally suited for the installation of very long pile elements as well as for drilling and mixing processes.